Navarra Canal
Spain
Agriculture, one of the pillars of human activity, must seek a balance between economy and sustainability. Having the water supply assured is compatible with the preservation of the natural environment.
Large hydraulic works can put the resource into service where it is really needed
The objective of this work is to enable 57,000 hectares of new irrigation, reinforce the existing 16,000 hectares, and ensure the supply of drinking water to various populations.
The design flow of the main trunk is 45 m³/s. It is a linear work that crosses the Province of Navarra from north to south, with a total length of 180 km, where IDOM has participated in several sections.