4 Biomass plants – 20 MWe each

Spain

Technical assistance to obtain the necessary permits in order to include in the Preliminary Allocation Register four new electric energy generating plants from biomass feedstocks (forest and/or energy crops) of 20 MWe each.

The scope of work include:

  • the preliminary engineering
  • the environmental impact assessment
  • the Integrated Environmental Authorization
  • collection and waste projects
  • drafting of the electricity evacuation line

And the rest of necessary documents and studies to obtain the necessary authorizations.

Biomass

  • Share on Facebook
  • Share with Twitter
  • Share with Linkedin

CLIENT:
ENCE

SCOPE:
Basic Engineering
Permits & Licensing
Procedures & Permits