Puente Nuevo Thermal Power Flue Gas Desulphurization Plant – 323 MW

Spain

In 2005, the Italian company ENEL built a Flue Gas Desulphurization plant in Puente Nuevo Power Plant within a larger Project that included the life extension of the complete plant.

The new installations are composed of :

  • Limestone Mills Building. Necessary to obtain the appropriate granulometry for the process
  • Desox Process Auxiliary Building. Including five pumps for the slurry movement and all the equipment necessary for the gypsum extraction.
  •  Storage Building. Including all the conveyor belts for the gypsum/limestone transport.

Additionally, many actuations were developed to extend the life of the essential equipments of the plant: boiler and steam turbine revamping process, new electrostatic Precipitator, generator, etc.

In this project IDOM performed detail engineering activities together with permitting and construction management.

Coal-fired Power Plants

  • Share on Facebook
  • Share with Twitter
  • Share with Linkedin

CLIENT:
ENEL

SCOPE:
Detailed Engineering
Permit Management
Project Management