El Hierro Hydrowind Power Plant – 10 MW

Spain

The island of El Hierro has taken up the challenge of ensuring that the electric power supplied to the island comes mostly from renewable energy sources. To this end, a hydro-electric plant has been built and commissioned. This plant combines 11.5 MW of installed power from wind generators with a reversible hydroelectric plant. The hydroelectric power plant has an installed power of 11 MW of generation and 6 MW of pumping power. Considering that the demand peak of the island is 7.5 MW, this configuration means that, in certain conditions, demand on the island can be fully met with clean and inexhaustible energies.

The challenge of energy self-sufficiency

IDOM has participated in the project from the conception phase to its implementation, providing engineering services, procurement management and technical assistance for the construction and commissioning. The El Hierro Hydroelectric Plant began operations in July 2015; in February 2018, it reached the milestone of supplying the island’s consumption for 18 days in a row with 100 % renewable energies. It is expected that, in the coming years, the plant will supply over 65% of the total demand of the island. Increasing the renewable power generation (more wind, solar, etc.), the system could come close to 100%.

Watch videos:

Gorona del Viento – Operating scheme

Gorona del Viento – El Hierro hydrowind power plant 

18 days at 100% (Spanish)

Hydroelectric Power Plants

  • Share on Facebook
  • Share with Twitter
  • Share with Linkedin
The challenge of achieving energy selfsufficiency

CLIENT:
Gorona del Viento El Hierro

SCOPE:
Detailed Engineering
Procurement Management
Technical Assistance during Commissioning
Technical Assistance during construction