0 %

Sorry, there are currently no results available

Projects

News

Recent Publications

Vídeos

Offices

Iron ore – Jindal Group
Complex integrated in the Mutún

Bolivia

IDOM has developed, on behalf of the Jindal group, the Basic Engineering of an Integrated Complex for the iron ore beneficiation plant with a capacity of 25 Mtpa, located in El Mutún (Bolivia), which includes:

  • Pellet Plant – 10 Mtpa.
  • DRI Plant – 6 Mtpa
  • Steelworks – 2 Mtpa
  • Hot-rolling mill- 1.7 Mtpa

Iron & Steel

  • Share on Facebook
  • Share with Twitter
  • Share with Linkedin

CLIENT:
JINDAL STEEL & POWER

SCOPE:
Basic Engineering

  • JINDAL_EN_EL_MUTUN_Iron_ore_Idom01
  • JINDAL_EN_EL_MUTUN_Iron_ore_Idom02