NESS Waste to Energy Plant in Scotland
UK
ACCIONA is responsible for the construction and operation of a waste‐to‐energy plant in Aberdeen (Scotland) called the Ness Energy Project.
With a capacity to treat 150,000 tonnes of waste per year, the plant will produce 15 MWe and 10 MWth for district heating. The plant will be made up of a single line with a treatment capacity of 400 t/d.
IDOM has developed the basic and detailed engineering of the project, as well as assisting in the procurement of all mechanical and electrical equipment, instrumentation, metal structure, and other auxiliary supplies.